SUPERVISING AUTHORITY | CULTURAL FOUNDATION OF THE PIRAEUS BANK GROUP | |||||||||||||||
CONTRACT DATE | 9/6/2008 | |||||||||||||||
COMPLETION DATE | 9/11/2008 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 616.023,73 / 733.068,24 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 503.643,82/ 599.336,15 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 554.511,82/659.869.10 |
SUPERVISING AUTHORITY | PIRAEUS BANK | |||||||||||||||
A. | CONTRACT DATE FOR THE PROJECT AND NEW WORKS | 14/9/2009 | ||||||||||||||
COMPLETION DATE | 7/7/2010 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 245.000,00 / 291.550,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 245.000,00 / 291.550,00 | |||||||||||||||
B. | CONTRACT DATE FOR ADDITIONAL WORKS | 8/6/2009 | ||||||||||||||
COMPLETION DATE | 7/7/2010 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 116.529,09 / 138.669,62 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 116.529,09 / 138.669,62 | |||||||||||||||
C. | CONTRACT DATE FOR AQUARIUM & ELECTRIC GENERATOR | 12/12/2008 | ||||||||||||||
COMPLETION DATE | 31/06/2009 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 199.560,00 / 237.476,40 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 199.560,00 / 237.476,40 | |||||||||||||||
SUM OF CONTRACTS (€) (WITHOUT VAT/ WITH VAT) | 561.089,09 / 667.696,02 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 605.975,21/726.453,26 |
SUPERVISING AUTHORITY | T.S. OF ARISTOTELEION UNIVERSITY OF THESSALONIKI | |||||||||||||||
CONTRACT DATE | 25/4/2006 | |||||||||||||||
COMPLETION DATE | 25/4/2008 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 3.943.069,61 / 4.692.252,84 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 3.943.069,61 / 4.692.252,84 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 4.652.822.14/5.536.858,351 |
SUPERVISING AUTHORITY | ALEX PAK A.E. | |||||||||||||||
CONTRACT DATE | 17/9/2007 | |||||||||||||||
COMPLETION DATE | 5/4/2008 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 2.600.000,00 / 3.094.000,00 | |||||||||||||||
ADDITIONAL WORKS NOT IN CONTRACT (€) (WITHOUT VAT/ WITH VAT) | 553.537,21 / 658.709,28 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 2.174.819,00 / 2.588.034,61 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 3.129.424,57 / 3.724.015,23 |
SUPERVISING AUTHORITY | TYDK OF LAKONIAS | |||||||||||||||
CONTRACT DATE | 24/7/2006 | |||||||||||||||
COMPLETION DATE | 24/2/2008 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 395.168,07 / 470.250,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 395.168,07 / 470.250,00 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 466.298,322/554.895,00 |
SUPERVISING AUTHORITY | CULTURAL FOUNDATION OF THE PIRAEUS BANK GROUP | |||||||||||||||
CONTRACT DATE | 18-05-2005 | |||||||||||||||
COMPLETION DATE WITH COMPLEMENTARY CONTRACTS | 05-12-2007 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 938.860,56/1.117.244,07 | |||||||||||||||
COMPLEMENTARY CONTRACT FOR STONEWORKS (€) (WITHOUT VAT/ WITH VAT) | 122.721,00 / 146.037,99 | |||||||||||||||
COMPLEMENTARY CONTRACT FOR ELECTRICAL WORKS (€) (WITHOUT VAT/ WITH VAT) | 37.582,97 / 44.723,73 | |||||||||||||||
COMPLEMENTARY CONTRACT FOR ADDITIONAL WORKS (€) (WITHOUT VAT/ WITH VAT) | 57.873,57 / 68.869,55 | |||||||||||||||
SUM OF CONTRACTS (€) (WITHOUT VAT/ WITH VAT) | 1.157.038,10 / 1.376.875,34 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 938.860,56 / 1.117.244,07 | |||||||||||||||
COMPLETED PROJECT BUDGET OF STONEWORKS (€) (WITHOUT VAT/ WITH VAT) | 122.721,00 / 146.037,99 | |||||||||||||||
COMPLETED PROJECT BUDGET OF ELECTRICAL WORKS (€) (WITHOUT VAT/ WITH VAT) | 37.582,97 / 44.723,73 | |||||||||||||||
COMPLETED PROJECT BUDGET OF ADDITIONAL CONTRACT (€) (WITHOUT VAT/ WITH VAT) | 57.873,57 / 68.869,55 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 1.400.016,10/1.677.034,16 |
SUPERVISING AUTHORITY | TYDK OF LAKONIAS | |||||||||||||||
CONTRACT DATE | 9/6/2006 | |||||||||||||||
COMPLETION DATE | 30/11/2007 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 463.116,24 / 551.108,33 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 463.116,24 / 551.108,33 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 546.477,16/650307,83 |
SUPERVISING AUTHORITY | MUNICIPALITY OF NEAPOLIS | |||||||||||||||
CONTRACT DATE | 29-09-2005 | |||||||||||||||
COMPLETION DATE | 29-03-2007 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 485.701,92/577.985,28 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 458.909,10 / 546.101,82 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 558.951,28/665.152,01 |
SUPERVISING AUTHORITY | GERMANOS S.A. | |||||||||||||||
CONTRACT DATE* | 28-11-2005 | |||||||||||||||
COMPLETION DATE* | 20-07-2006 | |||||||||||||||
CONTRACT BUDGET* (€) (WITHOUT VAT/ WITH VAT) | 287.503,08 / 342.128,70 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 287.503,08 / 342.128,70 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 350.178,75/416.712,75 | |||||||||||||||
*The project is partially executed as per construction flow. |
SUPERVISING AUTHORITY | TYDK OF LAKONIAS | |||||||||||||||
CONTRACT DATE | 22/12/05 | |||||||||||||||
COMPLETION DATE | 20/1/07 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 585.004,86 / 696.155,78 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 585.004,86 / 696.155,78 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 712.535,91/ 847.917,74 |
SUPERVISING AUTHORITY | EXTRA COMMUNICATION TECHNOLOGY EXCOM S.A. | |||||||||||||||
CONTRACT DATE | 1/4/06 | |||||||||||||||
COMPLETION DATE | 31/12/06 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 80.000,00 / 95.200,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 80.000,00 / 95.200,00 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 94.400,00/112.336,00 |
SUPERVISING AUTHORITY | ALMA ATERMON | |||||||||||||||
CONTRACT DATE | 1/4/06 | |||||||||||||||
COMPLETION DATE | 31/12/06 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 160.000,00 / 190.400,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 160.000,00 / 190.400,00 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 188.800,00/224.672,00 |
SUPERVISING AUTHORITY | ALMA ATERMON | |||||||||||||||
CONTRACT DATE | 1/4/06 | |||||||||||||||
COMPLETION DATE | 31/12/06 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 125.000,00 / 148.750,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 125.000,00 / 148.750,00 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 147.500,00/175.525,00 |
SUPERVISING AUTHORITY | MUNICIPALITY OF NEMEA | |||||||||||||||
CONTRACT DATE | 4/11/05 | |||||||||||||||
COMPLETION DATE | 15/12/06 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 582.841,00/ 693.580,79 | |||||||||||||||
CONTRACT OF COMPLEMENTARY BUDGET (€) (WITHOUT VAT/ WITH VAT) | 104.260,43 / 124.069,91 | |||||||||||||||
SUM OF CONTRACTS (€) (WITHOUT VAT/ WITH VAT) | 687.101,43 / 817.650,70 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 687.101,43 / 817.650,70 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 709.900,33/844.781,40 |
SUPERVISING AUTHORITY | TYDK LAKONIAS | |||||||||||||||
CONTRACT DATE | 30/3/05 | |||||||||||||||
COMPLETION DATE | 30/9/05 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 678.177,97/ 807.031,78 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 678.177,97/ 807.031,78 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 826.020,76/982.964,70 | |||||||||||||||
*On 02-06-06 signed complementary contract of the amount of 201.192,36€. |
SUPERVISING AUTHORITY | 736 D.S.Ε | |||||||||||||||
CONTRACT DATE | 18/2/05 | |||||||||||||||
COMPLETION DATE | 20/5/05 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 29.914,75/ 33.803,66 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 60.834,88/ 68.743,42 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 74.096,88/83.729,48 | |||||||||||||||
*The project was assigned to Ph. Apostolopoulos and executed by LYGEAS S.A. |
SUPERVISING AUTHORITY | OLYMPIC PROPERTIES S.A | |||||||||||||||
CONTRACT DATE | 4/2/05 | |||||||||||||||
COMPLETION DATE* | 31/1/06 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 15.047,11 / 17.906,06 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 28.518,24 / 33.937,06 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 34.735,21/41.335,34 | |||||||||||||||
*The project was executed, with partial assignments. |
SUPERVISING AUTHORITY | TECHNICAL DEPARTMENT OF THE ATTICON UNIVERSITY HOSPITAL | |||||||||||||||
CONTRACT DATE | 7/12/04 | |||||||||||||||
COMPLETION DATE | 20/10/05 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 197.529,00/ 235.059,51 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 218.417,00/259.446,25 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 218.417,00/259.446,25 | |||||||||||||||
*The project was executed, with partial assignments. |
SUPERVISING AUTHORITY | DEPANOM | |||||||||||||||
CONTRACT DATE | 9-10-2004/30-5-2004/10-1-2004/6-10-2003/9-7-2003 | |||||||||||||||
COMPLETION DATE | 15/5/2005 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 1.691.892,00/1.996.432,56 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 2.918.855,05/3.444.248,95 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 4.061.267,35/4.792.295,47 | |||||||||||||||
Main contractor : J/V "GENER S.A. – ERETVO S.A. – DOMOTECHNIKI S.A." |
SUPERVISING AUTHORITY | J/V MOCHLOS S.A.-EUROPAIKI TECHNIKI S.A. | |||||||||||||||
CONTRACT DATE | 13-5-2004 / 29-4-2003 | |||||||||||||||
COMPLETION DATE | 31/5/2005 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 553.500,00/ 631.890,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 490.612,42/ 578.922,65 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 636.814,92/751.441,60 | |||||||||||||||
The project has been interrupted at 30-7-2003. | ||||||||||||||||
The project restarted at 20 December 2003. | ||||||||||||||||
Main contractor : J/V MOCHLOS S.A. – EUROPAIKI TECHNIKI S.A. |
SUPERVISING AUTHORITY | EYDE / OC 2004 | |||||||||||||||
CONTRACT DATE | 10-02-2004/ 10-05-2003 | |||||||||||||||
COMPLETION DATE | 20/3/04 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 122.000,00/ 143.960,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 131.921.50/ 155.667,37 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 166.353,01/196.296,55 |
SUPERVISING AUTHORITY | ΕΥDΕ/ΟC 2004 | |||||||||||||||
CONTRACT DATE | 29/10/03 | |||||||||||||||
COMPLETION DATE | 28/2/04 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 265.555,50/ 313.355,49 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 255.257,70/ 301.204,09 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 331.324,49/390.962,90 |
SUPERVISING AUTHORITY | ΕΥDΕ / ΑΟΕΕ | |||||||||||||||
CONTRACT DATE | 30/6/03 | |||||||||||||||
COMPLETION DATE | 30/9/03 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 300.000,00/ 354.000,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 190.706,18/ 225.033,29 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 247.536,62/292.093,21 | |||||||||||||||
Main contractor : J/V MOCHLOS S.A. – ΙΝTRACOM CONSTRUCTIONS |
SUPERVISING AUTHORITY | LAMDA OLYMPIA VILLAGE SA | |||||||||||||||
CONTRACT DATE | 5/6/03 | |||||||||||||||
COMPLETION DATE | 30/10/03 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 75.000,00/ 88.500,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 85.711,02/ 101.139,00 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 111.252,90/131.278,42 | |||||||||||||||
Main contractor : MOCHLOS S.A. |
SUPERVISING AUTHORITY | ΕΥDΕ / ΟC 2004 | |||||||||||||||
CONTRACT DATE | 26/5/03 | |||||||||||||||
COMPLETION DATE | 28/2/2004 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 440.135,26 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 226.326,41/267.065,16 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 293.768,18/346.647,20 | |||||||||||||||
Main contractor : J & P – ΑVΑX S.A. |
SUPERVISING AUTHORITY | MUNICIPALITY OF AHARNON | |||||||||||||||
CONTRACT DATE | 20/8/02 | |||||||||||||||
COMPLETION DATE | 25/10/02 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 35.230,4/41.571,87 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 35.230,4/41.571,87 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 47.349,6576/49.054,80 |
SUPERVISING AUTHORITY | G - SYSTEMS | |||||||||||||||
CONTRACT DATE | 5–7-2002 | |||||||||||||||
COMPLETION DATE* | 26-10-2005 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 176.764,78/209.015,87 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 176.764,78/209.015,87 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 237.571,70/280.916,40 | |||||||||||||||
*The project was partially executed as per construction flow. |
SUPERVISING AUTHORITY | ΟΤΕ S.A. PATRAS | |||||||||||||||
CONTRACT DATE | 16/5/02 | |||||||||||||||
COMPLETION DATE | 1/4/03 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 68.190,00/80.464,2 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 77.233,33/91.135,33 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 103.801,60/122.485,88 | |||||||||||||||
The project was assigned to P. Amentas and executed by LYGEAS S.A. |
SUPERVISING AUTHORITY | O.T.E S.A. NAFPLION | |||||||||||||||
CONTRACT DATE | 29/3/02 | |||||||||||||||
COMPLETION DATE | 31/12/02 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 98.746,61/116.521,000 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 69.280,98/81.751,55 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 93.113,63/109.974,08 | |||||||||||||||
The project was assigned to P. Amentas and executed by LYGEAS S.A. |
SUPERVISING AUTHORITY | ΕΥDΕ / ΟC 2004 | |||||||||||||||
CONTRACT DATE | 20/4/02 | |||||||||||||||
COMPLETION DATE | 31/1/04 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 1.500.000,00/1.770.000,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 2.756.700,52/3.252.906,61 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 3.906.905,50/4.609.794,48 | |||||||||||||||
Main contractor GENER S.A. | ||||||||||||||||
The project was assigned by GENER S.A. to joint-venture LYGEAS S.A. and Sykas D. Tsilimidos N. with 50% participation of LYGEAS S.A. |
SUPERVISING AUTHORITY | LOCAL SELF ADMINISTRATION AUTHORITY OF VIOTIA | |||||||||||||||
CONTRACT DATE | 27 – 2 - 2001 | |||||||||||||||
COMPLETION DATE | 22 – 5 - 2001 | |||||||||||||||
CONTRACT BUDGET (DRACHMAE) | 5.191.525/6.125.999 | |||||||||||||||
FINAL PROJECT COST (DRACHMAE) | 5.191.525/6.125.999 | |||||||||||||||
UPDATED PROJECT COST (DRACHMAE) | 7.226.602/8.527.391 | |||||||||||||||
The project was assigned to joint – venture P. Amentas and executed by LYGEAS S.A. |
SUPERVISING AUTHORITY | OLYMPIC AIRWAYS INSTALLATIONS FACILITIES S.A. | |||||||||||||||
CONTRACT DATE | 22 – 1 - 2001 | |||||||||||||||
COMPLETION DATE | 20 – 4 - 2001 | |||||||||||||||
CONTRACT BUDGET (DRACHMAE) | 27.500.000/32.450.000 | |||||||||||||||
FINAL PROJECT COST (DRACHMAE) | 36.979.382/43.635.670 | |||||||||||||||
UPDATED PROJECT COST (DRACHMAE) | 51.475.299/60.740.852 | |||||||||||||||
The project was assigned to joint - venture P. AMENTAS – S. ZAMBOULAKIS – G. STRATEGOS and executed by LYGEAS S.A. |
SUPERVISING AUTHORITY | INTRAKOM CONSTRUCTIONS | |||||||||||||||
CONTRACT DATE | 4 – 1 - 2001 | |||||||||||||||
COMPLETION DATE | 15 – 3 - 2001 | |||||||||||||||
CONTRACT BUDGET (DRACHMAE) | 32.393.000/38.223.740 | |||||||||||||||
FINAL PROJECT COST (DRACHMAE) | 32.393.000/38.223.740 | |||||||||||||||
UPDATED PROJECT COST (DRACHMAE) | 45.091.056/53.207.446 |
SUPERVISING AUTHORITY | COSMOTE S.A. | |||||||||||||||
CONTRACT DATE | 16 – 10 - 2000 | |||||||||||||||
COMPLETION DATE* | 31 - 07 - 2002 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 336.900,00 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 336,900.00 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 484,799.10 |
SUPERVISING AUTHORITY | COSMOTE S.A. | |||||||||||||||
CONTRACT DATE | 07 – 07 - 2000 | |||||||||||||||
COMPLETION DATE* | 30 - 05 - 2002 | |||||||||||||||
CONTRACT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 1.969.281,18 | |||||||||||||||
COMPLETED PROJECT BUDGET (€) (WITHOUT VAT/ WITH VAT) | 1.705.745,48 | |||||||||||||||
UPDATED PROJECT COST (€) (WITHOUT VAT/ WITH VAT) | 2,454,567.75 | |||||||||||||||
*The project was partially executed as per construction flow. |
SUPERVISING AUTHORITY | OLYMPIC AIRWAYS INSTALLATIONS FACILITIES S.A. | |||||||||||||||
CONTRACT DATE | 3 – 5 - 2000 | |||||||||||||||
COMPLETION DATE | 12 – 6 - 2000 | |||||||||||||||
CONTRACT BUDGET (DRACHMAE) | 3.753.598/4.429.245 | |||||||||||||||
FINAL PROJECT COST (DRACHMAE) | 4.396.665/5.188.065 | |||||||||||||||
UPDATED PROJECT COST (DRACHMAE) | 6.326.800/7.465.624 | |||||||||||||||
The project was assigned to G. STRATEGOS and executed by LYGEAS S.A. |