Ioanna Amentas is a Mechanical Engineer, graduate of Ain Shams University of Egypt (1971). She speaks and writes fluently Greek & English and she has also a fair knowledge of Arabic.

She has an excellent knowledge of designing of all types of E/M installations as well as of all procedures within a construction company.

She was the Project Engineer of international consulting companies such as FRANK E. BASIL INC. and ACE ATHENS from 1972 up to 1985. Under her leadership the companies had successfully delivered large projects such as Dahran Land Forces Facilities (with large refrigerators and freezers for 60.000 people, mosques, administration and school Buildings), Riyadh 270 bed Hospital, R1 & R2 Modules of Yanbu Industrial City, Haji-Hassan Shopping & Offices Complex as well as his Villa, Air Base of Al Kharj, Tabuk 200 bed Military Hospital, Al Sulayyil Weapons Test Range Facilities, Preventive Medicine Centre in Ryadh. She also participated in the preliminaries of Bahrein Sheraton Hotel & Jubail Hilton in S. Arabia and Luxor Airport of Egypt.

From 1982 up to 2000 Ioanna Amentas was the owner of a consulting engineering office. The office had successfully delivered E/M design works for all types of large buildings, such as hospitals, hydrotherapeutic centers, hotels, housing complexes, concert halls, museums, universities, large central plants of steam and chilled water for industrial buildings, waste water treatment plant, hydro & thermo power stations for electricity production e.t.c.

Ioanna Amentas co-founded LYGEAS S.A in 2000 and now she is a technical consultant.

PROJECTS

No PROJECT OWNER YEAR EMPLOYER BUDGET  TO DAY WORTH  
DR DR.
1 Design of Construction Drawings and Calculations of the Mechanical Installations of the Offices and Substations of 150/20 KV Transformers, for PPC, at Aristidou str, Eleftherias  str.  (Pagrati, Psyhiko, and Piraeus, Greece. PPC 1972 A&S ANGELIDES  ______ ______ ______
2 Preliminary Design of the Mechanical Installations of the "Olympic Games Facilities Complex" in Kalogreza, in Athens, Greece. GENERAL SECRETARY OF ATHLETISM 1972 A&S ANGELIDES  ______ ______ ______
3 Design of Construction Drawings and Calculations of  all  the  Mechanical Installations  of  the  "180 Borders' Customs' Offices" in S. Arabia. MINISTRY OF DEFENCE OF S. ARABIA 1975 FRANK E.BASIL INC   900.000.000 33.561.000.000,00 98.491.562,73
4 Design of Construction Drawings and Calculations of the Mechanical Installations of the "Extention of the  200  beds  Tabuk  Military Hospital"  in  S. Arabia. MINISTRY OF DEFENCE OF S. ARABIA 1975 FRANK E.BASIL INC   200.000.000 7.458.000.000,00 21.887.013,94
5 Design of Construction Drawings and Calculations of the HVAC and Sound Protecton Installations of the  "Riyadh  270  beds  Public Hospital"  in  S. Arabia. MINISTRY OF HEALTH OF S. ARABIA 1976 ACE OF ATHENS    175.000.000 6.525.750.000,00 19.151.137,20
6 Design of Construction Drawings and Calculations of the Mechanical Installations of all the buildings of  the "Dahran Land Forces Facilities" in S. Arabia. MINISTRY OF  DEFENCE OF S. ARABIA 1978 ACE OF ATHENS    9,00E+13 2,66E+18 7,80E+15
7 Preparation of offers for the design of E/M Installations for projects all over Middle East. PRIVATE SECTOR 1978 ACE OF ATHENS    ______ ______ ______
8 Extension Doublication of above building HAJI HASSAN BEN ALI AL ALI 1979 ACE OF ATHENS    49.000.000 1.215.935.000,00 3.568.407,92
9 Design of Construction Drawings and Calculations of the Mechanical Installations  of  the  building of "6-storey Offices' and Shops' Building"  in Bahrain. HAJI HASSAN BEN ALI AL ALI 1979 ACE OF ATHENS    52.000.000 1.290.380.000,00 3.786.881,88
10 Design of Construction Drawings and Calculations of  the  Mechanical  Installations  of  a  Sheich's "Luxury Villa" in Bahrain. HAJI  HASSAN BEN ALI AL ALI 1980 ACE OF ATHENS    42.000.000 834.582.000,00 2.449.250,18
11 Design of Construction Drawings and Calculations of the Mechanical Installations of the "Extention of the  6-storey  Offices'  and  Shops'   Building" in Bahrain. HAJI HASSAN BEN ALI AL ALI 1980 ACE  OF ATHENS  49.000.000 973.679.000,00 2.857.458,55
12 Preliminary design of Construction Drawings and Calculations of the Mechanical Installations of the "Arrival & Departure Building of  the Airport of Luxor" in Egypt. MINISTRY OF TRANPORT OF EGYPT 1980 ACE  OF ATHENS  72.000.000 1.430.712.000,00 4.198.714,60
13 Design of Construction Drawings and Calculations of the Mechanical Installations of all the buildings of one sector of the "Industrial Zone in Yanbu", in S. Arabia. (Houses, Schools, Outpatient Clinics, etc). ROYAL COMMITION OF S. ARABIA 1981 ACE  OF  ATHENS  5.500.000.000 87.818.500.000,00 257.721.203,23
14 Preparation of offers for the design of E/M Installations in S. Arabia. VARIOUS IN S. ARABIA 1982 FRANK E.BASIL INC   ______ ______ ______
15 Design of Construction Drawings and Calculations of the Mechanical Installations for all the buildings of  the "Air Base of Al Kharj" in S. Arabia. (Air Force Academy for 4000 Students,  Schools, administration and com-mercial buildings, etc). MINISTRY OF DEFENCE OF S. ARABIA 1982 FRANK E.BASIL INC   180.000.000 2.372.580.000,00 6.962.817,31
16 Preliminary Design of the Mechanical Installations of the "500 Beds SHERATON Hotel" in Bahrain. PRIVATE SECTOR IN BAHRAIN 1982 FRANK E.BASIL INC   ______ ______ ______
17 Preliminary Design of the Mechanical Installations of the  "700  Beds  HILTON Hotel"  in  Jubail, in S. Arabia.  PRIVATE SECTOR        IN S. ARABIA 1982 FRANK E.BASIL INC   ______ ______ ______
18 Study on Nuclear, Bacteria and Chemical War protection shelters (NBC). MINISTRY OF DEFENCE OF S. ARABIA 1984 FRANK E.BASIL INC   ______ ______ ______
19 “Value Engineering" for Designs of Mechanical Internal Installations for U.S.A Millitary Bases  in Europe. (BOQ, Gymnasiums, Telecommunications Buildings). U.S.A  ARMY 1984 FRANK E.BASIL INC   ______ ______ ______
20 Design of Construction Drawings and Calculations of the Mechanical Installations for all the buildings of the "Missile Base  of Al Sulayyil" in S. Arabia. (Schools of all levels, administration and com-mercial buildings, cold storage warehouses, etc). MINISTRY OF DEFENCE OF S. ARABIA 1984 FRANK E.BASIL INC   50.000.000 462.950.000,00 1.358.620,69
21 Design of Construction Drawings and Calculations of  the  HVAC  Installations  of  the  "House  of Justice of Athens", in Greece. MINISTRY OF JUSTICE 1984 KAFETZO-POULOS  G.  80.000.000 740.720.000,00 2.173.793,10
22 Preliminary design of Construction Drawings and Calculations of the "External Natural Gas Piping Network" for the University City of Medina, in S. Arabia. MINISTRY OF EDUCATION OF S. ARABIA 1985 FRANK E.BASIL INC   130.000.000 1.008.930.000,00 2.960.909,76
23 Redesign of the "Central Mechanical Room of the Central Offices' Building of the B.P. Company, in Athens, Greece. B.P. HELLAS 1985 B.P. HELLAS ______ ______ ______
24 Design of Construction Drawings and Calculations of the E/M Installations of the "Preventive Medici-ne Centre", in Riyadh of S. Arabia. MINISTRY OF HEALTH OF S. ARABIA 1985 AMES LTD   240.000.000 1.862.640.000,00 5.466.294,94
25 Shop Drawings of the E/M Installations of the final stage  of  the  "200 Bed St. Nikolaos Hospital", in Crete, Greece. DISTRICT OF LASITHI 1986 EKTER AE  110.000.000 693.990.000,00 2.036.654,44
26 Design of Construction Drawings, Calculations and Specifications of the Internal E/M Installations of the "Water Power Plant" in Asomati, in Veria, Greece. PPC 1986 AEGEK AE  250.000.000 1.577.250.000,00 4.628.760,09
27 Design  of  Construction  Drawings, Calculations and Specifications of the E/M Installations of the "Storing and Exibition Facilities for the District Market" in Chania, in Crete, Greece. SKOP 1986 EKTER AE  100.000.000 630.900.000,00 1.851.504,04
28 Design of Construction Drawings, Calculations and Specifications of HVAC and Lighting Installations of the  "Central Offices and Main Computer System" of BARCLAYS Bank at Riankur str.", in Athens. BARCLAYS BANK 1986 BARCLAYS BANK 20.000.000 126.180.000,00 370.300,81
29 Preliminary Design of the E/M Installations of the "Waste  Water  Treatment   Plant" of  the City of Ioannina, in Greece. EKA OF IOANNINA 1986 C. KONSTA-NTINIDES   350.000.000 2.208.150.000,00 6.480.264,12
30 “Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Storing and Exibition Facilities of the District Market" in Korinthos, in Greece. SKOP 1987 EKTER AE  130.000.000 704.600.000,00 2.067.791,64
31 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Storing and Exibition Facilities of the District Market" in Kouloura, in Imathia, Greece. SKOP 1987 EKTER AE  130.000.000 704.600.000,00 2.067.791,64
32 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of all the buildings of "St. Fotini and Lagous Patagis", Millitary Base in Ebros, Greece. GREEK     ARMY 1987 EKTER AE  80.000.000 433.600.000,00 1.272.487,16
33 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Research Centre" of the University of Crete, in Heraklion, Greece. UNIVERSITY OF CRETE 1987 EKTER AE  & PSYKTIKE AE  280.000.000 1.517.600.000,00 4.453.705,06
34 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Athens Concert Hall",  in Athens, Greece. ΟΜΜΑ 1987 EKTER AE  960.000.000 5.203.200.000,00 15.269.845,93
35 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "5-storey Housing Building" in Chalandri,  Attica, Greece. A. DABOS 1987 A. DABOS 20.000.000 108.400.000,00 318.121,79
36 Preliminary Design of the E/M Installations of the "Waste  Water  Treatment   Plant" of  the City of Alexandroupolis, in N. Greece. EKA OF ALEXANDROUPOLIS 1987 C. KONSTA-NTINIDES   150.000.000 813.000.000,00 2.385.913,43
37 Design of Construction Drawings, Calculations and Specifications of HVAC and Lighting Installa-tions of the  "Central Offices of BARCLAYS Bank" in Boukourestiou str,  in Athens, Greece. BARCLAYS BANK 1987 IOANNA AMENTA 6.000.000 32.520.000,00 95.436,54
38 Design of Construction Drawings, Calculations and Specifications of the HVAC Installations of the "Atlas Maritime Co Offices" in Glyfada, in Athens, Greece. ATLAS MARITIME 1987 LUWA STEFATOS    100.000.000 542.000.000,00 1.590.608,95
39 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "University of Crete", in Rethymno, Greece. UNIVERSITY OF CRETE 1988 PSYKTIKE AE                                      & EKTER AE    300.000.000 1.432.200.000,00 4.203.081,44
40 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "3-storey Villa" in Brilisia, in Athens, Greece. C. KOMNIO-POULOS 1988 C. KOMNIO-POULOS 20.000.000 95.480.000,00 280.205,43
41 Design  of  Construction  Drawings,  Calculations and Specifications of HVAC and Lighting Installations of the "BARCLAYS Bank in Piraeus". BARCLAYS BANK 1988 IOANNA AMENTA 5.000.000 23.870.000,00 70.051,36
42 Design  of  Construction Drawings, Calculations and  Specifications  of the E/M  Installations  of  the "Ierapetra Hospital" in Crete,Greece. DISTRICT OF LASITHI 1988 EKTER AE  210.000.000 1.002.540.000,00 2.942.157,01
43 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Restaurants Complex", in Corfu, Greece. S. KOURIS, K. ZERVOS 1988 S. KOURIS & K. ZERVOS 60.000.000 286.440.000,00 840.616,29
44 “Aprovement of materials and HVAC Equipment for the repair of Telecomunication Wagons in Nea Makri", in Attica, Greece. U.S.A  ARMY 1988 C. KONSTA-NTINIDES 80.000.000 381.920.000,00 1.120.821,72
45 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Kalymnos Hospital", in Greece. DISTRICT OF DODEKANISE 1989 EKTER AE  180.000.000 755.820.000,00 2.218.107,12
46 Design of the E/M Installations for the Central Offices building at Riankour 80 in Athens. BARCLAYS BANK 1989 IOANNA AMENTA ______ ______ ______
47 E/M Installation works for the Central Computer Room of the Bank, situated at Riankour str, 80 in Athens. BARCLAYS BANK 1989 IOANNA AMENTA ______ ______ ______
48 Electrical Installation works for the 4nd floor of the Central Offices situated at Riankour 80 str, in Athens. BARCLAYS BANK 1989 IOANNA AMENTA ______ ______ ______
49 Electrical Installation works for the 3nd floor of the Central Offices situated at Riankour 80 str, in Athens. BARCLAYS BANK 1989 IOANNA AMENTA ______ ______ ______
50 Electrical Installation works for the 2nd floor of the Central Offices situated at Riankour 80 str, in Athens. BARCLAYS BANK 1989 IOANNA AMENTA ______ ______ ______
51 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Office Building" of  7500 m2 on No 1 Stadiou  and Kolokotrini str, in Athens, Greece. ADEXA 1989 ERMES AE  80.000.000 335.920.000,00 985.825,39
52 A/C Repair works at the Piraeus Branch of Barclays Bank. BARCLAYS BANK 1989 IOANNA AMENTA ______ ______ ______
53 A/C Installation works at the Piraeus Branch 1st floor of Barclays Bank. BARCLAYS BANK 1989 IOANNA AMENTA ______ ______ ______
54 Shop Drawings of the Central Steam Plant and Chilled Water Plant of the "Penicilline Production Unit" in Pallini of Attica Greece. EFAE 1990 EKTER AE  250.000.000 871.750.000,00 2.558.327,22
55 Shop Drawings of the Steam System, Medical Gases,  Compressed Air and Vacuum, Plumbing Waste and Drainage, all Electrical Installations , Plant Rooms, Kitchen, Laundry, e.t.c of the "Arta 220 beds District Hospital" in Central-East Greece. DISTRICT OF ARTA 1990 GETEM AE  500.000.000 1.743.500.000,00 5.116.654,44
56 Shop Drawings of the Central Steam Plant and Chilled Water Plant of the "Penicilline Production Unit" in Patras, Greece. EFAE 1990 EKTER AE  200.000.000 697.400.000,00 2.046.661,78
57 Shop Drawings of the E/M Installations of all the buildings of the Complex of "Hydrotherapeutic Center of Kyllini" in Central-West Peloponnese, as well as all the piping network of the hot and cold spring water. MINISTRY OF TOURISM 1990 SARANTO-POULOS AE KORONTZES AE  & EKTER AE 800.000.000 2.789.600.000,00 8.186.647,10
58 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the villa of D. Aslanoglou in P. Psychiko, in Athens, Greece. DEMETRES ASLANOGLOU 1991 DEMETRES ASLANOGLOU  120.000.000 350.280.000,00 1.027.967,72
59 Design of Construction Drawings, Calculations and  Specifications  of the E/M  Installations  of  the "Vacation Housing Complex" of P & I Amentas in Kyllini, Greece. AMENTAS PANAYIOTIS 1991 AMENTAS PANAYIOTIS 15.000.000 43.785.000,00 128.495,96
60 Preparation of Construction drawings for the HVAC installations for Killini Hydrotherapeutic Centre in Peloponese. MINISTRY OF TOURISM 1991 SARANTO-POULOS AE KORONTZES AE  & EKTER AE  ______ ______ ______
61 Design of Construction Drawings  for the PPC 5th Unit Steam Power Plant at Ag. Dimitrios in Kozani, N. Greece. PPC 1991 AEGEK AE  800.000.000 2.335.200.000,00 6.853.118,12
62 Shop Drawings of HVAC, Plumbing Waste and Drainage, Steam System and BMS of the "Larissa 220 beds District Hospital" in Central-East Greece. DISTRICT OF LARISA 1991 EKTER AE  400.000.000 1.167.600.000,00 3.426.559,06
63 Design of Construction Drawings, Calculations and Specifications of the Ventilation and Heating Installations of the St. Athanassios Church in Polydroso of Amaroussion, in Athens, Greece. CHURCH OF ST. ATHANA-SSIOS 1991 CHURCH OF ST. ATHANA-SSIOS 20.000.000 58.380.000,00 171.327,95
64 Design of Electrical sub-station for the Nestoras Agricalture Co-operative. --- 1992 BIMEPP ABE ______ ______ ______
65 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Mc DONALDS΄ Restaurants" of Glyfada, Korinthos, Thessaloniki, Peristeri, Monastiraki and Pagrati, in Greece. Mc DONALD OF GREECE 1992 DIONYSIOS SPANOS     1.800.000 4.534.200,00 13.306,53
66 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Forestry Offices' Building" in Chania, in Crete, Greece. MINISTRY OF AGRICULTURE 1992 EKTER AE  280.000.000 705.320.000,00 2.069.904,62
67 Design of Construction Drawings, Calculations and Specifications of  the  E/M  Installations of a "Vacation   Housing   Complex"  in  Mykonos, Greece. PAPA-GEORGIOU N, CHORITES K. 1992 PAPA-GEORGIOU N, CHORITES K. 30.000.000 75.570.000,00 221.775,50
68 Preliminary Design of the piping of the Mechanical Installations of the "NIKAS ABE Factory", in Attica Greece. NIKAS ABE 1992 DIEKAT AE  30.000.000 75.570.000,00 221.775,50
69 Design of Construction Drawings and Calculations of  the  E/M Installations of the Turbine, Bunker and Boiler Houses of the 5th Unit (420 MW) of the Steam Power Plant of St. Dimitrios", in Kozani, N. Greece. PPC 1992 AEGEK AE  800.000.000 2.015.200.000,00 5.914.013,21
70 Preparation of cost estimate documents for the PPC bidding offer for the Kozani Central Heating Installations with superheated water in N. Greece.   1992 AEGEK AE  ______ ______ ______
71 Preparation of cost estimate documents for the PPC bidding offer for the Hydro-electric Power Plant of Platanovrisi in N. Greece PPC 1992 AEGEK AE  ______ ______ ______
72 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Laboratory Building for the Physics Department No. 2" of the University of Crete, in Greece. UNIVERSITY OF CRETE 1992 PSYKTIKE AE    & EKTER AE  300.000.000 755.700.000,00 2.217.754,95
73 Design of Construction Drawings of E/M Installations (HVAC, Steam e.t.c.) of the Larissa District Area Hospital MUNICIPALITY OF LARISSA 1992 EKTER AE  ______ ______ ______
74 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "7-Storey Offices' and Shops'  and 5-Storey Underground Garages' Building", in Athens, Greece. EKTER AE 1992 EKTER AE  80.000.000 201.520.000,00 591.401,32
75 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Housing Complex"  of P. Tsembeles, in Skiathos, Greece. TSEMBELES 1993 TSEMBELES 6.000.000 13.212.000,00 38.773,29
76 Preliminary design of Sepolia station for the Athens Underground (Metro) ATHENS UNDER-GROUND (METRO) 1993 METON AE   AEGEK AE --- --- ---
77 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Vacation Housing Complex" in Skiathos, Greece. TOURISTIKI SKIATHOS AE 1993 TOURISTIKI SKIATHOS AE 60.000.000 132.120.000,00 387.732,94
78 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the villa of A. Alamanes in Ekali, in Athens, Greece. A. ALAMANES 1993 A. ALAMANES  20.000.000 44.040.000,00 129.244,31
79 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Battle Vehicles' Simulators Building" in Avlona, in Biotia, Greece. GENERAL ELECTRIC     OF  USA 1993 DIEKAT AE     & EXON  AE   150.000.000 330.300.000,00 969.332,36
80 Design of Construction Drawings, Calculations and Specifications of the Buildings' Facilities of the "Natural Gas Dehydration Unit in Strymonochori", in Serres, N. Greece. DEPA 1993 EKTER AE  200.000.000 440.400.000,00 1.292.443,14
81 Design of Construction Drawings, Calculations and Specifications of Plumbing Water and Fire Protection and Detection Installations of the "Aigi-nition Hospital" in Athens, Greece. EGINITION HOSPITAL 1993 KROMMYDAS & K. MARKA-NTONES  35.000.000 77.070.000,00 226.177,55
82 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Model of Painting Facilities and Office Building" for the Company AKZO AE, in Kapandriti, Greece  ΑΚΖΟ ΑΕ 1994 AKZO AE  150.000.000 297.900.000,00 874.247,98
83 Design of Construction Drawings, Calculations and  Specifications of the Lighting and HVAC  of the "Control Rooms, Relay Rooms and Computer Rooms of Units 8 & 9" of the Steam Power Plant of St George in Keratsini, in Piraeus, Greece. PPC 1994 PPC  OF KERATSINI 106.000.000 210.516.000,00 617.801,91
84 Shop Drawings for HVAC, Plumbing, BMS, and Electrical Installations for Strong Currents for the "Byzantine & Cristianity Museum", in Athens. MINISTRY OF CULTURE 1995 GEK AE  TECHNO-DOMIKH AE  & EKTER AE  600.000.000 1.093.800.000,00 3.209.977,99
85 Design of Construction Drawings, Calculations and Specifications of the E/M Installations of the "Earth Quake's Victims Housing Complexes" in the Districts of Kozani and Grevena, in N. Greece. MINISTRY OF WORKS 1995 ABETTE, TECHNODOME AE  BROS TRAVLOU AE  & EKTER AE  80.000.000 145.840.000,00 427.997,07
86 Design of Construction Drawings, Calculations and Specifications of the E/M Installations for the "300 Pupils' School of N. Artaki", in Evia, Greece. MINISTRY OF WORKS 1995 GEORGOUSO-POULOS & SAKELLA-RAKES 100.000.000 182.300.000,00 534.996,33
87 Design of Construction Drawings, Calculations and Specifications of the Lighting in the "Control Rooms of Units 1, 2 & 3" of the Steam Power Plant of Megalopoli, in Pelloponesse, Greece. PPC 1995 PPC  OF MEGALOPOLE 14.000.000 25.522.000,00 74.899,49
88 Design and Construction drawings for the re-arrangement of the central Mechanical Room Equipment, fire protection design, and redesign of HVAC & Lighting for the Translators are of the Kyllini Hydrotherapy Centre in Peloponese MINISTRY OF TOURISM 1996 SARANTO-POULOS AE KORONTZES AE & EKTER AE  ______ ______ ______
89 Shop Drawings for the "Waste Water Treatment Plant of the Hydrotherapeutic Centre of Kyllini", in Pelloponnese, Greece. MINISTRY OF TOURISM 1997 EKTER AE (Contractor) 80.000.000 127.680.000,00 374.702,86
90 Design and Calculations of the E/M Installations for the "Surrounding area near KAT Hospital" in Amaroussio, in Athens. MUNICIPALITY OF AMAROUSSIO 1997 ERKYNA AE  90.000.000 143.640.000,00 421.540,72
91 Preparation of bidding offer cost-estimate documents for the construction of the new dormitories of the Araxos Air Base (NATO) ARAXOS AIR BASE 1997 EKTER AE ______ ______ ______
92 Design of the "As Built" E/M Drawings of the "House of Justice of Thiba", in Biotia, Greece. MINISTRY OF JUSTICE 1997 EKTER AE   ______ ______ ______
93 Design of Construction Drawings, Calculations and Specifications of Plumbing water and Spring water and Electrical Installations of the "Hydro - therapeutic and Inhalation Centre of Lisbori," in Lesbos, Greece. COMMUNITY OF LISBORI   LESBOS  1997 BERBERES PARASHOS (Chem. Eng.) 30.000.000 47.880.000,00 140.513,57
94 Design and Construction drawings of the HVAC works for the "Popular Art, Museum" in Katerini of N. Greece. BOTSOGLOU 1998 BOTSOGLOU 15.000.000 22.860.000,00 67.087,31
95 Design and Construction drawings of the HVAC works for a 120-bed Hotel in Delphoi Greece. ______ 1998 LOGGOS & CO OPERATORS 250.000.000 381.000.000,00 1.118.121,79
96 Design and Construction drawings,  issuance of construction  permissions of the E/M installations for a 4-storey building of three appartments at Kolonaki in Athens. M. & H. BURMESTER & CHORITES CHORITES Co. 1998 M. & H. BURMESTER & CHORITES CHORITES Co. 120.000.000 182.880.000,00 536.698,46
97 Construction drawings of luxury 2-storey villas of different types for the 4000-bed "Four seasons Hotel Resort" at Sharm El-Sheikh, in Egypt by the Red Sea . ALEXANDRIA & SAUDI COMPANY FOR TOURISM PROJECTS (S.A.E.) 1998 J & P (OVERSEANS Ltd.)  2.000.000.000 3.048.000.000,00 8.944.974,32
98 Electrification of Base Stations for the GSM operator  COSMOTE S.A. in Greece. COSMOTE S.A. 2001 LYGEAS S.A. EKTER S.A. DIEKAT, EGNATIA, SARATSIS ______ ______ ______
99 Design and Construction drawings, issuance of construction  permissions of the E/M works for the renovation of the 1000m2 luxury villa in Ekali, Athens, Greece. ALKO A.T.E. 2000 ALKO A.T.E. 50.000.000 71.950.000,00 211.151,87
100 Issuance of construction permissions for all works (Architectural, Civil, E/M) for Base stations for the GSM operator  COSMOTE S.A., in Greece. COSMOTE S.A. 2001 LYGEAS S.A., OLYMPIOS, DIEKAT, GENER e.t.c. 400.000.000 556.800.000,00 1.634.042,55
101 Construction drawings of Base Stations for the GSM operator COSMOTE S.A. in Greece. COSMOTE S.A. 2000 LYGEAS S.A. 800.000.000 1.151.200.000,00 3.378.429,93
102 Construction drawings of Base Stations for the A.M.C.(Albania Mobile Communications) GSM operator in Albania. A.M.C. 2000 LYGAL SH.A. 1.200.000 1.726.800,00 5.067,64
103 Design and Construction drawings of the A/C works for the old and the extension of the Municipality House of Tirane in Albania.. MUNICIPALITY OF TIRANE 2001 GEA SH.A. 90.000.000 125.280.000,00 367.659,57
104 Design of the project: "Design - Construction of the extension of the chilled water system for the fuel, building 41". HELLENIC AEROSPACE INDUSTRY 2002 P. AMENTAS (Participated in the biding) 267.058.000 358.925.952,00 1.053.341,02